From the Vrbas riverbank to new electric public transport, the city’s development raises an important question: can we trace the path from a problem and its underlying data, through the project brief and professional criteria, to the decision, responsibility and measurable result?
Banja Luka is changing. The Vrbas riverbank is being developed, public spaces are being redesigned, and electric buses and new public transport concepts are being introduced or announced.
A city should develop, test new solutions and adapt to the needs of its residents. That is precisely why major changes benefit from a clearly documented path showing how they were reached.
For citizens, it matters not only what will be built. It also matters how it was established that a particular solution is what the city needs.
A major decision begins with a problem and data
For a significant public project, it should be possible to follow a simple sequence:
problem → input data → project brief → possible solutions → selection criteria → professional review → decision → implementation → result
Such a trail benefits everyone. It enables citizens to understand a decision, professionals to examine it, and the City Administration to demonstrate why a particular solution was selected.
The Vrbas riverbank and the new concept of electric public transport provide two useful examples for testing this approach.
What was the project brief for the Vrbas riverbank?
Riverbank development can pursue several legitimate objectives at the same time: bank protection, fire protection, public-space improvement, recreation, better connections between parts of the city and enhancement of the urban environment.
That makes the initial project brief important.
What problem was the designer expected to solve? Who defined the project brief? Which urban-planning, hydrotechnical, environmental and other professional criteria were set? Which alternatives were considered, and who carried out the professional review of the selected solution?
It is equally important to determine in advance how the project’s success will be measured after completion.
If the objective is riverbank protection, one set of indicators can be used. If the objective is the quality of public space, other indicators are needed. If the project is expected to achieve several objectives at once, each can be clearly defined before construction begins.
Electric public transport: a decision that can be measured
Electrification of public transport can bring a range of benefits to the city. That is precisely why it would be useful to see the data on which the choice of a particular solution was based.
If the objective is to reduce congestion, we need to know how many vehicles use the planned corridors. If the objective is to increase public-transport use, it is important to know how many passengers currently use existing routes. If the objective is to improve travel speed, current journey times and congestion points need to be measured.
This leads to a very concrete question:
Are traffic-count data available for the routes planned for the new electric vehicles?
How many vehicles use those corridors during peak hours? How many people already use public transport? What capacity is required? How were the technology and capacity of the new vehicles selected on the basis of those figures?
These data make something else possible: measuring the result.
If passenger numbers, car traffic, average travel time, timetable reliability, costs and other relevant indicators are recorded before the project begins, they can be measured again six or twelve months later.
At that point, the phrase “successful project” becomes a verifiable claim.
A contemporary vision of the city gives individual projects a framework
Individual decisions carry additional weight because of long-term urban planning.
Banja Luka still does not have a newly adopted Urban Plan. The existing Urban Plan dates from 1975, while the new plan remains in procedure.
This makes it particularly important to show how major individual projects fit into the city’s long-term development vision.
Where will people live? Where will they work? Along which corridors will they travel? What will the public-transport network look like? How will new residential areas, schools, workplaces, recreational areas and the city centre be connected?
A contemporary urban-planning framework connects precisely these individual decisions into a coherent whole.
Authority and responsibility should be equally visible
Major decisions also have an institutional path.
The legal and administrative structure provides for city departments and their heads. At the same time, documents issued by the City Administration can carry signatures of persons acting “by authority of the Mayor.”
Such authorization can be a legitimate instrument for the functioning of an administration. For the public, however, it is important that responsibility is as visible as authority.
Who manages a department when its head has not been appointed? What exactly does the authorization cover? Does it concern signing documents, managing work, making professional decisions, or several of these functions? Who approves a project brief and who is responsible for its content?
A clear answer protects both the institution and the person acting under authorization, because it distinguishes the act of signing a document from responsibility for the decision that preceded it.
Where does the Creative Team fit into the system?
In previous years, the City Administration has also publicly referred to its Creative Team, which has been associated with ideas and interventions concerning the appearance of public spaces.
Such a team can be a valuable source of new ideas.
That is precisely why its place in the decision-making system should be clear.
Who are the members of the Creative Team? By what formal act was it established? What authority does it have? Does it propose ideas, prepare solutions or participate in selecting them? Who professionally reviews its proposals, and who assumes responsibility when an idea becomes a city project?
Creativity and institutional responsibility can work very well together when the path from idea to decision is visible.
A changing city can show how it makes decisions
The Vrbas riverbank and electric public transport therefore represent more than two major city projects.
They provide an opportunity to show the entire path of a public decision:
What are we trying to solve?
What do the data show?
Who defined the project brief?
Which solutions were considered?
By what criteria was one selected?
Who professionally reviewed it?
Who made the decision?
Who assumes responsibility?
How will the result be measured?
When the answers and the documentary trail exist, a public decision becomes verifiable.
That is particularly valuable for a city undergoing major change. A transparent process does not slow development. It allows good decisions to become a source of learning, weaker decisions to be improved, and experience from one project to become knowledge for the next.
At Civic Forensics, examples like these are increasingly opening a new direction for our work. Individual projects remain important, but it is becoming even more interesting to understand how a public decision itself is formed and whether its path can be reconstructed from the initial data to the measured outcome.
It appears that Civic Forensics has a particularly interesting and creative period ahead.